Projects are executed under live utility conditions, with continuity and operational reliability treated as non-negotiable requirements. Approvals are earned through execution history and compliance performance.
Saudi Electricity Company (SEC)
PP10 Al-Kharj Power Plant
API 650 field-erected storage tanks executed for one of the Kingdom’s major power generation facilities. Delivered under live operational conditions to non-negotiable continuity requirements.
API 650 · Power Generation
Saline Water Conversion Corporation (SWCC)
Al Jubail RO Desalination Plant
Field-erected steel storage tanks including firefighting and chemical tank systems. Final project approval granted by SWCC following full compliance verification and inspection.
22,000 m³ · SWCC Approved
SWRO Infrastructure Project
Jeddah South SWRO
25,000 m³ demineralized water storage tank for seawater reverse osmosis infrastructure. One of the largest single-tank projects delivered by Al Ayash to date.
25,000 m³ · Demineralized Water
Power Generation Project
Wadi Al-Dawasir Power Project
Two field-erected tanks totalling 2 × 10,000 m³ executed for strategic power reserve storage. Delivered to API 650 compliance under controlled erection sequences.